RIVER /AND LAKE DREDGING SLURRY TREATMENT SOLUTIONS

Over the past 30 years of reform and opening up, China’s economy has made rapid progress, Urban beauti.ication cannot do without the ecological management of inland rivers, and decades of sediment reauireeffective solutions. Meibang Group has many years of experience in river cleaning technology and practice.with successful and effective cases in multiple provinces such as Shandong, Hainan, Chongging, HubeiFuiian,Jianasu,Guangdong, Anhui, etc.

1.River silt cleaning
2.Mudandsewageentertheequipment
3.Filter out mud cake and water

China Electric Power Construction Municipal – Anhui Chaohu Dredging and Remediation Projec

Project Overview: This project is a pilot project for ecological dredging of Chaohu Lake by China Electric Power Construction Municipal Construction Group Co., Ltd. It is an important ecological project for Chaohu Lake governance, which started construction in 2021. The main construction contents include dredging engineering, sediment consolidation, tailwater treatment, and wetland restoration in the lakeside zone
Project result: The design of the lake dredging and remediation project includes three parts: suction dredger for extracting sediment from the bottom of the lake, garbage separation, and sewage treatment system. Large suction dredgers are used to extract sediment from the bottom of the lake to the onshore collection pool, and the waste and stones are separated through the separation system. The separated sewage slurry is subjected to solid-liquid separation treatment, and the filtered water and dry mud are obtained. The dry mud can be used for wetland restoration in the surrounding area.

China Railway Group Dongguan Dongyin Canal Comprehensive Management Project
Project Overview: This project is a comprehensive renovation project of Dongguan Dongyin Canal by China Railway 11th Bureau Group Co., Ltd., with a total of 5 stations, including 1. Hengli in Dongguan; 2. Dongguan Qishi; 3. Dongguan Chashan; 4. Dongguan Qiaotou; 5. Dongguan Shipai.
Project result: The river regulation project design includes two parts: garbage screening and sewage treatment system. The silt pumped up from the river is screened for garbage, and the screened sewage slurry is subjected to solid-liquid separation treatment. After passing through the filter press, clear water and dry mud are obtained. The clear water can return to the river to become clear, and the dry mud can be used for surrounding greening.